Substation Scout

Neptune Gas Generation Plant

ERCOT queue ID 28INR0219

Neptune Gas Generation Plant (28INR0219) is listed in the ERCOT interconnection queue as a 113.8 MW gas project in Reeves County, TX. The filing names Longpast_T8 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of March 15, 2028. It records the screening study as complete on April 18, 2025.

Queue ID28INR0219
Project nameNeptune Gas Generation Plant
Status (as published)SS Completed, FIS Started, No IA
SubstationLongpast_T8
Point of interconnection11200 Longpast_T8 138kv
CountyReeves
StateTX
Voltage138 kV
Capacity113.8 MW
Resource (as published)GAS/IC
Resource categoryGas (normalized for filtering)
Target commercial operation2028-03-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Reeves, TX: 27 requests in the ERCOT queue, 24 active totaling 8,349.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBPX Production Company
CDR reporting zoneWEST
Fuel codeGAS
Technology codeIC
Screening study complete2025-04-18

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.