Verily Solar (FKA Cuello De Cuero Solar)
ERCOT queue ID 28INR0059
| Queue ID | 28INR0059 |
|---|---|
| Project name | Verily Solar (FKA Cuello De Cuero Solar) |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Reforzar Switch Station |
| Point of interconnection | 80078 Reforzar Switch Station 345kV |
| County | Brooks |
| State | TX |
| Voltage | 345 kV |
| Capacity | 261 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2029-07-01 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Verily Solar, LLC |
|---|---|
| Cdr Zone | SOUTH |
| Fuel Code | SOL |
| Technology Code | PV |
| Screening Study Complete | 45462 |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.