Bodkin BESS SLF
ERCOT queue ID 27INR0611
Bodkin BESS SLF (27INR0611) is listed in the ERCOT interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Brazoria County, TX. The filing names The Danbury Dab DANBUR_POI_8 (BUS#) Station as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 1, 2027. It records the screening study as complete on June 30, 2026.
| Queue ID | 27INR0611 |
|---|---|
| Project name | Bodkin BESS SLF |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | The Danbury Dab DANBUR_POI_8 (BUS#) Station |
| Point of interconnection | The 138kV Danbury Dab DANBUR_POI_8 (BUS#42875) Station |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2027-12-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Capacity revised | −75.4 | SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Bodkin BESS, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2026-06-30 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.