Pecos Wind

ERCOT queue ID 27INR0510

Pecos Wind (27INR0510) is listed in the ERCOT interconnection queue as a 193.8 MW wind project in Pecos County, TX. The filing names Tap Solstice (SOLSTICE7A) – Bakersfield (L_BAKERS5_1Y) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Not Started, IA”, with a target commercial operation date of May 30, 2028. It records the screening study as complete on September 30, 2025 and the interconnection agreement as signed on March 18, 2026.

Queue ID27INR0510
Project namePecos Wind
Status (as published)SS Completed, FIS Not Started, IA
SubstationTap Solstice (SOLSTICE7A) – Bakersfield (L_BAKERS5_1Y)
Point of interconnectionTap 345 kV 60404 Solstice (SOLSTICE7A) – 76002 Bakersfield (L_BAKERS5_1Y)
CountyPecos
StateTX
Voltage345 kV
Capacity193.8 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2028-05-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityMidnight Energy Center, LLC
CDR reporting zoneWEST
Fuel codeWIN
Technology codeWT
Interconnection agreement signed2026-03-18
Screening study complete2025-09-30
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.