Pecos Wind
ERCOT queue ID 27INR0510
Pecos Wind (27INR0510) is listed in the ERCOT interconnection queue as a 193.8 MW wind project in Pecos County, TX. The filing names Tap Solstice (SOLSTICE7A) – Bakersfield (L_BAKERS5_1Y) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Not Started, IA”, with a target commercial operation date of May 30, 2028. It records the screening study as complete on September 30, 2025 and the interconnection agreement as signed on March 18, 2026.
| Queue ID | 27INR0510 |
|---|---|
| Project name | Pecos Wind |
| Status (as published) | SS Completed, FIS Not Started, IA |
| Substation | Tap Solstice (SOLSTICE7A) – Bakersfield (L_BAKERS5_1Y) |
| Point of interconnection | Tap 345 kV 60404 Solstice (SOLSTICE7A) – 76002 Bakersfield (L_BAKERS5_1Y) |
| County | Pecos |
| State | TX |
| Voltage | 345 kV |
| Capacity | 193.8 MW |
| Resource (as published) | WIN/WT |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2028-05-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Midnight Energy Center, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | WIN |
| Technology code | WT |
| Interconnection agreement signed | 2026-03-18 |
| Screening study complete | 2025-09-30 |
| Water availability | Not Required |