Gulf Prairie Solar

ERCOT queue ID 27INR0449

Queue ID27INR0449
Project nameGulf Prairie Solar
Status (as published)SS Completed, FIS Started, No IA
Substation(CEHESub) looped either 1) on circuit 82 between RIWOOD (#) and Angleton (#), or 2) on circuit 18 between DOW (#) and Huizache (#)
Point of interconnection(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)
CountyBrazoria
StateTX
Voltage138 kV
Capacity202.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2028-12-01
Source datasetlarge

Additional filed fields

Interconnecting EntityGulf Prairie Energy LLC
Cdr ZoneCOASTAL
Fuel CodeSOL
Technology CodePV
Screening Study Complete45916
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.