Clairemont Solar 1
ERCOT queue ID 27INR0435
| Queue ID | 27INR0435 |
|---|---|
| Project name | Clairemont Solar 1 |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Novaprime |
| Point of interconnection | 59908 Novaprime 345kV |
| County | Kent |
| State | TX |
| Voltage | 345 kV |
| Capacity | 251.8 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2029-02-13 |
| Source dataset | large |
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-07 | Status change | n/a | SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA |
Additional filed fields
| Interconnecting Entity | Clairemont Solar LLC |
|---|---|
| Cdr Zone | WEST |
| Fuel Code | SOL |
| Technology Code | PV |
| Ia Signed | 45985 |
| Screening Study Complete | 45764 |
| Fis Approved | 46247 |
| Air Permit | Not Required |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.