Abeja Solar Farm

ERCOT queue ID 27INR0372

Queue ID27INR0372
Project nameAbeja Solar Farm
Status (as published)SS Completed, FIS Started, IA
SubstationTap PALADIO7A - TANGO7A
Point of interconnectionTap 345kV 8012 PALADIO7A - 8689 TANGO7A
CountyBee
StateTX
Voltage345 kV
Capacity200.8 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2028-09-08
Source datasetlarge

Additional filed fields

Interconnecting EntityAbeja Solar Farm LLC
Cdr ZoneSOUTH
Fuel CodeSOL
Technology CodePV
Ia Signed46007
Screening Study Complete45708
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.