Lima Solar Project

ERCOT queue ID 27INR0234

Queue ID27INR0234
Project nameLima Solar Project
Status (as published)SS Completed, FIS Started, IA
SubstationTap Haggerty Switch () to Van Al ()
Point of interconnectionTap 138 kV Haggerty Switch (12677) to Van Al (1754) 138kV
CountyGrayson
StateTX
Voltage138 kV
Capacity101.3 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2029-03-01
Source datasetlarge

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Status change n/a SS Completed, FIS Started, No IA → SS Completed, FIS Started, IA

Full change log →

Additional filed fields

Interconnecting EntityIndustrial Lima Project, LLC
Cdr ZoneNORTH
Fuel CodeSOL
Technology CodePV
Ia Signed46267
Screening Study Complete45509
Water AvailabilityNot Required