Goby Energy Center (27INR0209) is listed in the ERCOT interconnection queue as a 200.7 MW battery project in Brazoria County, TX. The filing names Tap line Karsten - Thompsons as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 7, 2029. It records the screening study as complete on August 15, 2024.

Queue ID27INR0209
Project nameGoby Energy Center
Status (as published)SS Completed, FIS Started, No IA
SubstationTap line Karsten - Thompsons
Point of interconnectionTap 138kV line 44390 Karsten - 44721 Thompsons
CountyBrazoria
StateTX
Voltage138 kV
Capacity200.7 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-09-07
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGoby Energy Center
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2024-08-15

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first