Larrea Solar
ERCOT queue ID 27INR0146
Larrea Solar (27INR0146) is listed in the ERCOT interconnection queue as a 231.6 MW solar project in Pecos County, TX. The filing names Tap Bakerfield - Solstice CKT#1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 18, 2029. It records the screening study as complete on March 29, 2024.
| Queue ID | 27INR0146 |
|---|---|
| Project name | Larrea Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Bakerfield - Solstice CKT#1 |
| Point of interconnection | Tap 345kV 76002 Bakerfield - 60404 Solstice CKT#1 |
| County | Pecos |
| State | TX |
| Voltage | 345 kV |
| Capacity | 231.6 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-09-18 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Greasewood IV LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2024-03-29 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.