Substation Scout

Larrea Solar

ERCOT queue ID 27INR0146

Larrea Solar (27INR0146) is listed in the ERCOT interconnection queue as a 231.6 MW solar project in Pecos County, TX. The filing names Tap Bakerfield - Solstice CKT#1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 18, 2029. It records the screening study as complete on March 29, 2024.

Queue ID27INR0146
Project nameLarrea Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Bakerfield - Solstice CKT#1
Point of interconnectionTap 345kV 76002 Bakerfield - 60404 Solstice CKT#1
CountyPecos
StateTX
Voltage345 kV
Capacity231.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-09-18
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGreasewood IV LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2024-03-29
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first