Gatsby Energy Storage

ERCOT queue ID 27INR0139

Gatsby Energy Storage (27INR0139) is listed in the ERCOT interconnection queue as a 103.4 MW battery project in Pecos County, TX. The filing names Fort Lancaster Substation (PSSE Bus #) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2030. It records the screening study as complete on April 29, 2024.

Queue ID27INR0139
Project nameGatsby Energy Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationFort Lancaster Substation (PSSE Bus #)
Point of interconnectionFort Lancaster 138 kV Substation (PSSE Bus #76579)
CountyPecos
StateTX
Voltage138 kV
Capacity103.4 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2030-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGatsby Energy Storage LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2024-04-29

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.