Rubicon Power BESS
ERCOT queue ID 27INR0096
Rubicon Power BESS (27INR0096) is listed in the ERCOT interconnection queue as a 301.4 MW battery project in Brazoria County, TX. The filing names TNMP FM524 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 31, 2028. It records the screening study as complete on February 8, 2024.
| Queue ID | 27INR0096 |
|---|---|
| Project name | Rubicon Power BESS |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | TNMP FM524 |
| Point of interconnection | 39703 TNMP FM524 138kV |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 301.4 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-05-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Rubicon Power LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2024-02-08 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.