Substation Scout

Rubicon Power BESS

ERCOT queue ID 27INR0096

Rubicon Power BESS (27INR0096) is listed in the ERCOT interconnection queue as a 301.4 MW battery project in Brazoria County, TX. The filing names TNMP FM524 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 31, 2028. It records the screening study as complete on February 8, 2024.

Queue ID27INR0096
Project nameRubicon Power BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationTNMP FM524
Point of interconnection39703 TNMP FM524 138kV
CountyBrazoria
StateTX
Voltage138 kV
Capacity301.4 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-05-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityRubicon Power LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2024-02-08

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.