Hecate Energy Orem Wind

ERCOT queue ID 27INR0061

Hecate Energy Orem Wind (27INR0061) is listed in the ERCOT interconnection queue as a 1,542 MW wind project in Brazoria County, TX. The filing names Jones Creek as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 1, 2030. It records the screening study as complete on September 22, 2023.

Queue ID27INR0061
Project nameHecate Energy Orem Wind
Status (as published)SS Completed, FIS Started, No IA
SubstationJones Creek
Point of interconnection42530 Jones Creek 345kV
CountyBrazoria
StateTX
Voltage345 kV
Capacity1,542 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2030-06-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityHecate Energy LLC
CDR reporting zoneCOASTAL
Fuel codeWIN
Technology codeWT
Screening study complete2023-09-22
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.