Hovey Solar 2

ERCOT queue ID 26INR0736

Hovey Solar 2 (26INR0736) is listed in the ERCOT interconnection queue as a 8.1 MW solar project in Pecos County, TX. The filing names Solstice as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of September 15, 2026. It records the interconnection agreement as signed on December 26, 2013.

Queue ID26INR0736
Project nameHovey Solar 2
Status (as published)In Queue
SubstationSolstice
Point of interconnection60385 Solstice 138 kV
CountyPecos
StateTX
Voltage138 kV
Capacity8.1 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2026-09-15
Source datasetsmall

Same substation and county

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBARILLA SOLAR, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Interconnection agreement signed2013-12-26

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.