Juno 3 Solar
ERCOT queue ID 26INR0621
Juno 3 Solar (26INR0621) is listed in the ERCOT interconnection queue as a 600 MW solar project in Borden County, TX. The filing names # Buck Canyon as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of November 30, 2027. It records the screening study as complete on June 9, 2025 and the interconnection agreement as signed on July 1, 2025.
| Queue ID | 26INR0621 |
|---|---|
| Project name | Juno 3 Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | # Buck Canyon |
| Point of interconnection | #59916 Buck Canyon 345kV |
| County | Borden |
| State | TX |
| Voltage | 345 kV |
| Capacity | 600 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-11-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
# Buck Canyon substation: 2 requests in the ERCOT queue, 2 active totaling 1,200 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 27INR0500 | Antila Solar | 600 | Solar | SS Completed, FIS Started, IA |
Borden, TX: 19 requests in the ERCOT queue, 17 active totaling 5,556.7 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Capacity revised | +100 | SS Completed, FIS Started, IA → SS Completed, FIS Started, IA |
Additional filed fields
| Interconnecting entity | Juno Solar 3 |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2025-07-01 |
| Screening study complete | 2025-06-09 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.