ERCOT queue ID 26INR0550

Grand Mesa BESS (26INR0550) is listed in the ERCOT interconnection queue as a 253.3 MW battery project in Pecos County, TX. The filing names MESA VIEW SWITCH as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 28, 2027. It records the screening study as complete on November 13, 2024.

Queue ID26INR0550
Project nameGrand Mesa BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationMESA VIEW SWITCH
Point of interconnection76582 MESA VIEW SWITCH 138kV
CountyPecos
StateTX
Voltage138 kV
Capacity253.3 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-09-28
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityPERRY GREEN POWER LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2024-11-13

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first