Comanche Creek generating station

ERCOT queue ID 26INR0537

Comanche Creek generating station (26INR0537) is listed in the ERCOT interconnection queue as a 107 MW gas project in Pecos County, TX. The filing names TNCENTRY1_1 [] as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2027. It records the screening study as complete on September 23, 2024.

Queue ID26INR0537
Project nameComanche Creek generating station
Status (as published)SS Completed, FIS Started, No IA
SubstationTNCENTRY1_1 []
Point of interconnectionTNCENTRY1_1 [138 kV] ( 38431)
CountyPecos
StateTX
Voltage138 kV
Capacity107 MW
Resource (as published)GAS/IC
Resource categoryGas (normalized for filtering)
Target commercial operation2027-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityLongfellow Power LLC
CDR reporting zoneWEST
Fuel codeGAS
Technology codeIC
Screening study complete2024-09-23

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.