Rosharon BESS
ERCOT queue ID 26INR0497
Rosharon BESS (26INR0497) is listed in the ERCOT interconnection queue as a 120 MW battery project in Brazoria County, TX. The filing names Archer (ACH) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of June 30, 2028. It records the screening study as complete on July 5, 2024 and the full interconnection study as approved on January 14, 2026.
| Queue ID | 26INR0497 |
|---|---|
| Project name | Rosharon BESS |
| Status (as published) | SS Completed, FIS Completed, No IA |
| Substation | Archer (ACH) |
| Point of interconnection | 138 kV 42570 Archer (ACH) |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 120 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-06-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Rosharon BESS LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2024-07-05 |
| Full interconnection study approved | 2026-01-14 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.