BumbleBee Solar

ERCOT queue ID 26INR0412

Queue ID26INR0412
Project nameBumbleBee Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap PawneeSW5 - Tango
Point of interconnectionTap 345kV 5725 PawneeSW5 - 8689 Tango
CountyBee
StateTX
Voltage345 kV
Capacity200.9 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2031-03-01
Source datasetlarge

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Capacity revised −10.7 SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting EntityBumbleBee Solar Farm LLC
Cdr ZoneSOUTH
Fuel CodeSOL
Technology CodePV
Screening Study Complete45436
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.