Liatris Flexible Gas
ERCOT queue ID 26INR0408
Liatris Flexible Gas (26INR0408) is listed in the ERCOT interconnection queue as a 204.7 MW gas project in Brazoria County, TX. The filing names Tap Nash - WA Parish CKT02 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of February 1, 2029. It records the screening study as complete on June 19, 2024 and the interconnection agreement as signed on November 1, 2025.
| Queue ID | 26INR0408 |
|---|---|
| Project name | Liatris Flexible Gas |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Tap Nash - WA Parish CKT02 |
| Point of interconnection | Tap 138 kV (42980) Nash - (44010) WA Parish CKT02 |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 204.7 MW |
| Resource (as published) | GAS/GT |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2029-02-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Stone Creek Peaker LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | GAS |
| Technology code | GT |
| Interconnection agreement signed | 2025-11-01 |
| Screening study complete | 2024-06-19 |
| Air permit | 2024-05-22 |
| Water availability | 2026-02-18 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.