Aggie Solar Project SLF
ERCOT queue ID 26INR0388
Aggie Solar Project SLF (26INR0388) is listed in the ERCOT interconnection queue as a 103.7 MW solar project in Reeves County, TX. The filing names POI: COYOTE SPRINGS SUBSTATION - BUS NUMBER : COUNTY : REEVES POI LOCATION: 31., -103.6252777 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of November 30, 2027. It records the screening study as complete on April 29, 2024, the full interconnection study as approved on July 3, 2025 and the interconnection agreement as signed on September 30, 2026.
| Queue ID | 26INR0388 |
|---|---|
| Project name | Aggie Solar Project SLF |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | POI: COYOTE SPRINGS SUBSTATION - BUS NUMBER : COUNTY : REEVES POI LOCATION: 31., -103.6252777 |
| Point of interconnection | POI: COYOTE SPRINGS SUBSTATION - 138KV BUS NUMBER : 38113 COUNTY : REEVES POI LOCATION: 31.396675, -103.6252777 |
| County | Reeves |
| State | TX |
| Voltage | 138 kV |
| Capacity | 103.7 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-11-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Reeves, TX: 27 requests in the ERCOT queue, 24 active totaling 8,349.7 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Status change | n/a | SS Completed, FIS Completed, No IA → SS Completed, FIS Completed, IA |
Additional filed fields
| Interconnecting entity | reNRG TX 8 LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2026-09-30 |
| Screening study complete | 2024-04-29 |
| Full interconnection study approved | 2025-07-03 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.