Cobra Clean Energy Center
ERCOT queue ID 26INR0374
Cobra Clean Energy Center (26INR0374) is listed in the ERCOT interconnection queue as a 100.4 MW battery project in Brazoria County, TX. The filing names looped on circuit 04 between Mustang Bayou (#) and Hudson (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 8, 2027. It records the screening study as complete on May 1, 2024.
| Queue ID | 26INR0374 |
|---|---|
| Project name | Cobra Clean Energy Center |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | looped on circuit 04 between Mustang Bayou (#) and Hudson (#) |
| Point of interconnection | looped on circuit 04 between Mustang Bayou (#42960) and Hudson (#42100) |
| County | Brazoria |
| State | TX |
| Voltage | Not reported |
| Capacity | 100.4 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2027-10-08 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Cobra Clean Energy Center LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2024-05-01 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.