Cobra Clean Energy Center

ERCOT queue ID 26INR0374

Cobra Clean Energy Center (26INR0374) is listed in the ERCOT interconnection queue as a 100.4 MW battery project in Brazoria County, TX. The filing names looped on circuit 04 between Mustang Bayou (#) and Hudson (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 8, 2027. It records the screening study as complete on May 1, 2024.

Queue ID26INR0374
Project nameCobra Clean Energy Center
Status (as published)SS Completed, FIS Started, No IA
Substationlooped on circuit 04 between Mustang Bayou (#) and Hudson (#)
Point of interconnectionlooped on circuit 04 between Mustang Bayou (#42960) and Hudson (#42100)
CountyBrazoria
StateTX
VoltageNot reported
Capacity100.4 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-10-08
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityCobra Clean Energy Center LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2024-05-01

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.