Sandford Storage

ERCOT queue ID 26INR0319

Sandford Storage (26INR0319) is listed in the ERCOT interconnection queue as a 100.9 MW battery project in Wise County, TX. The filing names Tap Bird Dog (Bus #) - Jacksboro (Bus #) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of January 30, 2029. It records the screening study as complete on March 29, 2024.

Queue ID26INR0319
Project nameSandford Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Bird Dog (Bus #) - Jacksboro (Bus #)
Point of interconnectionTap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429)
CountyWise
StateTX
Voltage345 kV
Capacity100.9 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-01-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Bird Dog (Bus #) - Jacksboro (Bus #) substation: 2 requests in the ERCOT queue, 2 active totaling 227.1 MW.

Queue IDProjectMWResourceStatus
26INR0318Sandford Solar126.2SolarSS Completed, FIS Started, No IA

Wise, TX: 11 requests in the ERCOT queue, 10 active totaling 3,798 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBT Sandford Solar, LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Screening study complete2024-03-29
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.