Tap Bird Dog (Bus #) - Jacksboro (Bus #) substation interconnection queue
2 active projects totaling 227.1 MW in the ERCOT queue.
2 ERCOT queue filings name Tap Bird Dog (Bus #) - Jacksboro (Bus #) as the point of interconnection, all in Wise County, TX.
Target commercial operation date as filed: Jan 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: BT Sandford Solar, LLC (2 filings).
2active projects
227.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 26INR0318 | Sandford Solar | 345 | 126.2 | Solar | SS Completed, FIS Started, No IA | Jan 2029 |
| 26INR0319 | Sandford Storage | 345 | 100.9 | Battery | SS Completed, FIS Started, No IA | Jan 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Wise County, TX
- RAMHORNH 5: 2 active, 2,000 MW of 2 filed