Brazos River BESS
ERCOT queue ID 26INR0314
Brazos River BESS (26INR0314) is listed in the ERCOT interconnection queue as a 180.4 MW battery project in Brazoria County, TX. The filing names Tap West Colombia LOCAL TNP - ANGLETON TNP as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of October 30, 2027. It records the screening study as complete on January 1, 2024 and the interconnection agreement as signed on May 24, 2025.
| Queue ID | 26INR0314 |
|---|---|
| Project name | Brazos River BESS |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Tap West Colombia LOCAL TNP - ANGLETON TNP |
| Point of interconnection | Tap 138kV 39530 West Colombia LOCAL TNP - 39560 ANGLETON TNP |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 180.4 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2027-10-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Status change | n/a | SS Completed, FIS Completed, IA → SS Completed, FIS Started, IA |
Additional filed fields
| Interconnecting entity | Brazos River BESS LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2025-05-24 |
| Screening study complete | 2024-01-01 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.