Substation Scout

First Capitol BESS

ERCOT queue ID 26INR0226

First Capitol BESS (26INR0226) is listed in the ERCOT interconnection queue as a 257.5 MW battery project in Brazoria County, TX. The filing names Tap West Columbia Main - Sweeny Cogen as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of November 30, 2028. It records the screening study as complete on December 14, 2023 and the interconnection agreement as signed on May 15, 2025.

Queue ID26INR0226
Project nameFirst Capitol BESS
Status (as published)SS Completed, FIS Started, IA
SubstationTap West Columbia Main - Sweeny Cogen
Point of interconnectionTap 138kV West Columbia Main (39500) - Sweeny Cogen (110505)
CountyBrazoria
StateTX
Voltage138 kV
Capacity257.5 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-11-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityFirst Capitol BESS, LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2025-05-15
Screening study complete2023-12-14
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.