First Capitol BESS
ERCOT queue ID 26INR0226
First Capitol BESS (26INR0226) is listed in the ERCOT interconnection queue as a 257.5 MW battery project in Brazoria County, TX. The filing names Tap West Columbia Main - Sweeny Cogen as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of November 30, 2028. It records the screening study as complete on December 14, 2023 and the interconnection agreement as signed on May 15, 2025.
| Queue ID | 26INR0226 |
|---|---|
| Project name | First Capitol BESS |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Tap West Columbia Main - Sweeny Cogen |
| Point of interconnection | Tap 138kV West Columbia Main (39500) - Sweeny Cogen (110505) |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 257.5 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-11-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | First Capitol BESS, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2025-05-15 |
| Screening study complete | 2023-12-14 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.