Seven Springs Solar

ERCOT queue ID 26INR0147

Queue ID26INR0147
Project nameSeven Springs Solar
Status (as published)SS Completed, FIS Started, IA
SubstationTap COPPERAS COVE Kempner
Point of interconnectionTap 7061 COPPERAS COVE 7260 Kempner 138kV
CountyLampasas
StateTX
Voltage138 kV
Capacity145 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2028-05-26
Source datasetlarge

Additional filed fields

Interconnecting EntityHancock Springs, LLC
Cdr ZoneNORTH
Fuel CodeSOL
Technology CodePV
Ia Signed45897
Screening Study Complete45274
Air PermitNot Required
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.