Lampasas, TX interconnection queue

11 active projects totalling 1,908.2 MW in the ERCOT queue.

11active projects
1,908.2active MW
11total filed
Queue IDProjectkVMWResourceStatus
28INR0324 Barkley Creek Solar 345 312.4 Solar SS Completed, FIS Started, No IA
28INR0277 Aurora Energy Storage 345 306.2 Battery SS Completed, FIS Completed, No IA
24INR0543 Thomas Cameron BESS 345 201.5 Battery SS Completed, FIS Completed, IA
26INR0489 Seven Springs Storage 138 170.5 Battery SS Completed, FIS Started, No IA
30INR0037 Solgen Solar 138 160.2 Solar SS Completed, FIS Started, No IA
30INR0038 Solgen Storage 138 150.3 Battery SS Completed, FIS Started, No IA
24INR0069 Triple B Solar Alt#2 138 150 Solar SS Completed, FIS Started, No IA
26INR0147 Seven Springs Solar 138 145 Solar SS Completed, FIS Started, IA
25INR0666 GIBSON BRANCH BESS 138 142.9 Battery SS Completed, FIS Started, No IA
24INR0494 Hana Springs BESS 138 100.8 Battery SS Completed, FIS Started, No IA
28INR0462 Senterfitt Solar 138 68.4 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.