Substation Scout

Bracero Pecan Storage

ERCOT queue ID 26INR0034

Bracero Pecan Storage (26INR0034) is listed in the ERCOT interconnection queue as a 238.2 MW battery project in Reeves County, TX. The filing names SARAGOSA as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of July 1, 2027. It records the screening study as complete on February 4, 2023 and the interconnection agreement as signed on June 27, 2024.

Queue ID26INR0034
Project nameBracero Pecan Storage
Status (as published)SS Completed, FIS Started, IA
SubstationSARAGOSA
Point of interconnection60716 SARAGOSA 138kV
CountyReeves
StateTX
Voltage138 kV
Capacity238.2 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-07-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Reeves, TX: 27 requests in the ERCOT queue, 24 active totaling 8,349.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBracero Pecan Storage LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2024-06-27
Screening study complete2023-02-04

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first