Bocanova Power II
ERCOT queue ID 25INR0706
Bocanova Power II (25INR0706) is listed in the ERCOT interconnection queue as a 150.5 MW battery project in Brazoria County, TX. The filing names TNMP Alvin as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of August 31, 2026. It records the screening study as complete on January 7, 2025, the full interconnection study as approved on March 7, 2025 and the interconnection agreement as signed on August 19, 2025.
| Queue ID | 25INR0706 |
|---|---|
| Project name | Bocanova Power II |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | TNMP Alvin |
| Point of interconnection | 39030 TNMP Alvin 138kV |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 150.5 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-08-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Bocanova Power II LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2025-08-19 |
| Screening study complete | 2025-01-07 |
| Full interconnection study approved | 2025-03-07 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.