Giga Texas Data Center
ERCOT queue ID 25INR0688
| Queue ID | 25INR0688 |
|---|---|
| Project name | Giga Texas Data Center |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | HORNSBY Substation POIB# Site will be connected behind the meter at Medium Voltage with non export controls GSU TRANSFORMER 80/106/133MVA DELTA PRIMARY WYE-G SECONDARY Z=XX%, 65DEG C RISE |
| Point of interconnection | HORNSBY Substation POIB# 7047 Site will be connected behind the meter at Medium Voltage 24.9 kV with non export controls GSU TRANSFORMER 80/106/133MVA 345kV DELTA PRIMARY 24.9kV WYE-G SECONDARY Z=XX%, 65DEG C RISE |
| County | Travis |
| State | TX |
| Voltage | 24.9 kV |
| Capacity | 133 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalised for filtering) |
| Target commercial operation | 2025-12-15 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Giga Texas Energy, LLC |
|---|---|
| Cdr Zone | SOUTH |
| Fuel Code | OTH |
| Technology Code | BA |
| Ia Signed | 45777 |
| Screening Study Complete | 45621 |
| Fis Approved | 45733 |
| Air Permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.