ERCOT queue ID 25INR0566

Copano Bay Energy Storage (25INR0566) is listed in the ERCOT interconnection queue as a 201 MW battery project in Brazoria County, TX. The filing names Tap Nash - WA Parish Ckt 2 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2028. It records the screening study as complete on January 22, 2024.

Queue ID25INR0566
Project nameCopano Bay Energy Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Nash - WA Parish Ckt 2
Point of interconnectionTap 138kV 42980 Nash - 44010 WA Parish Ckt 2
CountyBrazoria
StateTX
Voltage138 kV
Capacity201 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityCopano Bay Energy Storage, LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2024-01-22
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first