Friendswood Energy Storage

ERCOT queue ID 25INR0550

Friendswood Energy Storage (25INR0550) is listed in the ERCOT interconnection queue as a 105.1 MW battery project in Brazoria County, TX. The filing names TAP HASTINGS - FRIENDSWOOD as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of March 30, 2028. It records the screening study as complete on April 29, 2024 and the full interconnection study as approved on December 11, 2025.

Queue ID25INR0550
Project nameFriendswood Energy Storage
Status (as published)SS Completed, FIS Completed, No IA
SubstationTAP HASTINGS - FRIENDSWOOD
Point of interconnectionTAP 138kV 39010 HASTINGS - 38980 FRIENDSWOOD
CountyBrazoria
StateTX
Voltage138 kV
Capacity105.1 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-03-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityFriendswood Energy Storage LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2024-04-29
Full interconnection study approved2025-12-11

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.