Lazy Frog Solar SLF
ERCOT queue ID 25INR0504
| Queue ID | 25INR0504 |
|---|---|
| Project name | Lazy Frog Solar SLF |
| Status (as published) | SS Completed, FIS Completed, No IA |
| Substation | Thorn Tree Switch |
| Point of interconnection | 11688 Thorn Tree Switch 345kV |
| County | Franklin |
| State | TX |
| Voltage | 345 kV |
| Capacity | 100.4 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2028-04-17 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Lazy Frog Solar, LLC |
|---|---|
| Cdr Zone | NORTH |
| Fuel Code | SOL |
| Technology Code | PV |
| Screening Study Complete | 45274 |
| Fis Approved | 45958 |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.