Thorn Tree Switch substation interconnection queue

2 active projects totalling 100.4 MW in the ERCOT queue.

2active projects
100.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
25INR0504 Lazy Frog Solar SLF 345 100.4 Solar SS Completed, FIS Completed, No IA
25INR0506 Lazy Frog Storage SLF 345 0 Battery SS Completed, FIS Completed, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.