Bell Creek BESS (25INR0480) is listed in the ERCOT interconnection queue as a 200.9 MW battery project in Brazoria County, TX. The filing names Tap West Colombia - FM524 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of October 30, 2027. It records the screening study as complete on September 21, 2023, the full interconnection study as approved on May 16, 2024 and the interconnection agreement as signed on November 14, 2024.

Queue ID25INR0480
Project nameBell Creek BESS
Status (as published)SS Completed, FIS Completed, IA
SubstationTap West Colombia - FM524
Point of interconnectionTap 138kV 39500 West Colombia - 39703 FM524
CountyBrazoria
StateTX
Voltage138 kV
Capacity200.9 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-10-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBELL CREEK BESS, LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2024-11-14
Screening study complete2023-09-21
Full interconnection study approved2024-05-16

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first