Surfside Energy Storage (25INR0458) is listed in the ERCOT interconnection queue as a 50.3 MW battery project in Brazoria County, TX. The filing names Tap Angleton – Riwood ckt 82 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2028. It records the screening study as complete on October 10, 2023.

Queue ID25INR0458
Project nameSurfside Energy Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Angleton – Riwood ckt 82
Point of interconnectionTap 138kV 42110 Angleton – 43150 Riwood ckt 82
CountyBrazoria
StateTX
Voltage138 kV
Capacity50.3 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityRocky Mountain Energy Holdings, LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2023-10-10
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.