Bronc Rodeo Solar Project

ERCOT queue ID 25INR0440

Queue ID25INR0440
Project nameBronc Rodeo Solar Project
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Line from Temple Pecan Creek (#) to the Cow Bayou Switch (#)
Point of interconnectionTap 138 kV Line from Temple Pecan Creek (#3420) to the Cow Bayou Switch (#3385)
CountyFalls
StateTX
Voltage138 kV
Capacity105.7 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2029-04-16
Source datasetlarge

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Status change n/a SS Completed, FIS Completed, No IA → SS Completed, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting EntityEnergiekontor US Texas SP 16 LLC
Cdr ZoneNORTH
Fuel CodeSOL
Technology CodePV
Screening Study Complete45135
Air PermitNot Required
Water AvailabilityNot Required