Substation Scout

Bronc Rodeo Solar Project

ERCOT queue ID 25INR0440

Queue ID25INR0440
Project nameBronc Rodeo Solar Project
Status (as published)SS Completed, FIS Completed, No IA
SubstationTap Line from Temple Pecan Creek (#) to the Cow Bayou Switch (#)
Point of interconnectionTap 138 kV Line from Temple Pecan Creek (#3420) to the Cow Bayou Switch (#3385)
CountyFalls
StateTX
Voltage138 kV
Capacity105.7 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2028-09-18
Source datasetlarge

Additional filed fields

Interconnecting EntityEnergiekontor US Texas SP 16 LLC
Cdr ZoneNORTH
Fuel CodeSOL
Technology CodePV
Screening Study Complete45135
Fis Approved45741
Air PermitNot Required
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.