Aldrin 138 BESS (25INR0421) is listed in the ERCOT interconnection queue as a 207 MW battery project in Brazoria County, TX. The filing names (Bus: ) North Alvin TNMP as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of March 1, 2028. It records the screening study as complete on August 11, 2023, the full interconnection study as approved on August 22, 2025 and the interconnection agreement as signed on April 18, 2024.

Queue ID25INR0421
Project nameAldrin 138 BESS
Status (as published)SS Completed, FIS Completed, IA
Substation(Bus: ) North Alvin TNMP
Point of interconnection(Bus: 39015) North Alvin TNMP 138kV
CountyBrazoria
StateTX
Voltage138 kV
Capacity207 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-03-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityAldrin Energy Storage LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2024-04-18
Screening study complete2023-08-11
Full interconnection study approved2025-08-22
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first