Aldrin 138 BESS
ERCOT queue ID 25INR0421
Aldrin 138 BESS (25INR0421) is listed in the ERCOT interconnection queue as a 207 MW battery project in Brazoria County, TX. The filing names (Bus: ) North Alvin TNMP as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of March 1, 2028. It records the screening study as complete on August 11, 2023, the full interconnection study as approved on August 22, 2025 and the interconnection agreement as signed on April 18, 2024.
| Queue ID | 25INR0421 |
|---|---|
| Project name | Aldrin 138 BESS |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | (Bus: ) North Alvin TNMP |
| Point of interconnection | (Bus: 39015) North Alvin TNMP 138kV |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 207 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-03-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Aldrin Energy Storage LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2024-04-18 |
| Screening study complete | 2023-08-11 |
| Full interconnection study approved | 2025-08-22 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.