Austin Bayou Storage II
ERCOT queue ID 25INR0236
Austin Bayou Storage II (25INR0236) is listed in the ERCOT interconnection queue as a 156.6 MW battery project in Brazoria County, TX. The filing names Tap to CKT#27 from Savana (Bus# ) to Oasis (Bus# ) – Line as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of June 1, 2029. It records the screening study as complete on June 5, 2023 and the interconnection agreement as signed on February 14, 2025.
| Queue ID | 25INR0236 |
|---|---|
| Project name | Austin Bayou Storage II |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Tap to CKT#27 from Savana (Bus# ) to Oasis (Bus# ) – Line |
| Point of interconnection | Tap to CKT#27 from Savana (Bus# 43180) to Oasis (Bus# 43035) – 345 kV Line |
| County | Brazoria |
| State | TX |
| Voltage | 345 kV |
| Capacity | 156.6 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-06-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Austin Bayou Solar, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2025-02-14 |
| Screening study complete | 2023-06-05 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.