Austin Bayou Storage II

ERCOT queue ID 25INR0236

Austin Bayou Storage II (25INR0236) is listed in the ERCOT interconnection queue as a 156.6 MW battery project in Brazoria County, TX. The filing names Tap to CKT#27 from Savana (Bus# ) to Oasis (Bus# ) – Line as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of June 1, 2029. It records the screening study as complete on June 5, 2023 and the interconnection agreement as signed on February 14, 2025.

Queue ID25INR0236
Project nameAustin Bayou Storage II
Status (as published)SS Completed, FIS Started, IA
SubstationTap to CKT#27 from Savana (Bus# ) to Oasis (Bus# ) – Line
Point of interconnectionTap to CKT#27 from Savana (Bus# 43180) to Oasis (Bus# 43035) – 345 kV Line
CountyBrazoria
StateTX
Voltage345 kV
Capacity156.6 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-06-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityAustin Bayou Solar, LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2025-02-14
Screening study complete2023-06-05
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.