Substation Scout

Austin Bayou Storage II

ERCOT queue ID 25INR0236

Queue ID25INR0236
Project nameAustin Bayou Storage II
Status (as published)SS Completed, FIS Started, IA
SubstationTap to CKT#27 from Savana (Bus# ) to Oasis (Bus# ) – Line
Point of interconnectionTap to CKT#27 from Savana (Bus# 43180) to Oasis (Bus# 43035) – 345 kV Line
CountyBrazoria
StateTX
Voltage345 kV
Capacity156.6 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalised for filtering)
Target commercial operation2027-06-01
Source datasetlarge

Additional filed fields

Interconnecting EntityAustin Bayou Solar, LLC
Cdr ZoneCOASTAL
Fuel CodeOTH
Technology CodeBA
Ia Signed45702
Screening Study Complete45082
Air PermitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.