Inadale Solar

ERCOT queue ID 25INR0196

Inadale Solar (25INR0196) is listed in the ERCOT interconnection queue as a 281 MW solar project in Scurry County, TX. The filing names Tap TONKAWAW_5 – SCURCNTYS_5 Circuit #2 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of March 2, 2029. It records the screening study as complete on May 19, 2023 and the full interconnection study as approved on August 3, 2026.

Queue ID25INR0196
Project nameInadale Solar
Status (as published)SS Completed, FIS Completed, No IA
SubstationTap TONKAWAW_5 – SCURCNTYS_5 Circuit #2
Point of interconnectionTap 345 kV TONKAWAW_5 (11048) – SCURCNTYS_5 (11318) Circuit #2
CountyScurry
StateTX
Voltage345 kV
Capacity281 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-03-02
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap TONKAWAW_5 – SCURCNTYS_5 Circuit #2 substation: 2 requests in the ERCOT queue, 2 active totaling 568.2 MW.

Queue IDProjectMWResourceStatus
25INR0197Inadale BESS287.2BatterySS Completed, FIS Started, No IA

Scurry, TX: 23 requests in the ERCOT queue, 17 active totaling 5,057.9 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Status change n/a SS Completed, FIS Started, No IA → SS Completed, FIS Completed, No IA

Full change log →

Additional filed fields

Interconnecting entityInadale Solar, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2023-05-19
Full interconnection study approved2026-08-03
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.