Substation Scout

Pinewood Solar

ERCOT queue ID 25INR0170

Queue ID25INR0170
Project namePinewood Solar
Status (as published)SS Completed, FIS Started, IA
SubstationSeabreeze
Point of interconnection43020 Seabreeze 345kV
CountyBrazoria
StateTX
Voltage345 kV
Capacity150.7 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2028-02-29
Source datasetlarge

Additional filed fields

Interconnecting EntityBrazoria Solar II, LLC
Cdr ZoneCOASTAL
Fuel CodeSOL
Technology CodePV
Ia Signed45785
Screening Study Complete44895
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.