Pinewood Solar

ERCOT queue ID 25INR0170

Pinewood Solar (25INR0170) is listed in the ERCOT interconnection queue as a 150.7 MW solar project in Brazoria County, TX. The filing names Seabreeze as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of February 29, 2028. It records the screening study as complete on November 30, 2022 and the interconnection agreement as signed on May 8, 2025.

Queue ID25INR0170
Project namePinewood Solar
Status (as published)SS Completed, FIS Started, IA
SubstationSeabreeze
Point of interconnection43020 Seabreeze 345kV
CountyBrazoria
StateTX
Voltage345 kV
Capacity150.7 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-02-29
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBrazoria Solar II, LLC
CDR reporting zoneCOASTAL
Fuel codeSOL
Technology codePV
Interconnection agreement signed2025-05-08
Screening study complete2022-11-30
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first