August Draw Solar
ERCOT queue ID 25INR0112
| Queue ID | 25INR0112 |
|---|---|
| Project name | August Draw Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Tap Verhalen – Hoefs Road |
| Point of interconnection | Tap 138kV 60207 Verhalen – 60808 Hoefs Road |
| County | Reeves |
| State | TX |
| Voltage | 138 kV |
| Capacity | 250 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2028-06-27 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | August Draw Solar Holdings, LLC |
|---|---|
| Cdr Zone | WEST |
| Fuel Code | SOL |
| Technology Code | PV |
| Ia Signed | 45912 |
| Screening Study Complete | 44908 |
| Air Permit | Not Required |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.