Elio BESS
ERCOT queue ID 25INR0103
Elio BESS (25INR0103) is listed in the ERCOT interconnection queue as a 205.3 MW battery project in Brazoria County, TX. The filing names Weinbrenner Station (Bus #) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of December 31, 2028. It records the screening study as complete on October 1, 2022, the full interconnection study as approved on October 31, 2024 and the interconnection agreement as signed on September 15, 2024.
| Queue ID | 25INR0103 |
|---|---|
| Project name | Elio BESS |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Weinbrenner Station (Bus #) |
| Point of interconnection | 138 kV Weinbrenner Station (Bus #42990) |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 205.3 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Capacity revised | −111.9 | SS Completed, FIS Completed, IA → SS Completed, FIS Completed, IA |
Additional filed fields
| Interconnecting entity | Elio Energy LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2024-09-15 |
| Screening study complete | 2022-10-01 |
| Full interconnection study approved | 2024-10-31 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.