Substation Scout

Reis Solar

ERCOT queue ID 25INR0082

Queue ID25INR0082
Project nameReis Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTapping into line () Choke Canyon AEP to () San Miguel Gen
Point of interconnectionTapping into 138 kV line (5689) Choke Canyon AEP to (5902) San Miguel Gen
CountyAtascosa
StateTX
Voltage138 kV
Capacity105.5 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2027-08-03
Source datasetlarge

Additional filed fields

Interconnecting EntityGreenalia Solar Power Reis LLC
Cdr ZoneSOUTH
Fuel CodeSOL
Technology CodePV
Screening Study Complete44802
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.