Byrd Ranch Repower
ERCOT queue ID 24INR0712
Byrd Ranch Repower (24INR0712) is listed in the ERCOT interconnection queue as a 5.5 MW battery project in Brazoria County, TX. The filing names SWEENY as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of January 22, 2027. It records the interconnection agreement as signed on December 14, 2020.
| Queue ID | 24INR0712 |
|---|---|
| Project name | Byrd Ranch Repower |
| Status (as published) | In Queue |
| Substation | SWEENY |
| Point of interconnection | 39700 SWEENY 138kV |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 5.5 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2027-01-22 |
| Source dataset | small |
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Byrd Ranch Storage LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2020-12-14 |