Byrd Ranch Repower (24INR0712) is listed in the ERCOT interconnection queue as a 5.5 MW battery project in Brazoria County, TX. The filing names SWEENY as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of January 22, 2027. It records the interconnection agreement as signed on December 14, 2020.

Queue ID24INR0712
Project nameByrd Ranch Repower
Status (as published)In Queue
SubstationSWEENY
Point of interconnection39700 SWEENY 138kV
CountyBrazoria
StateTX
Voltage138 kV
Capacity5.5 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-01-22
Source datasetsmall

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityByrd Ranch Storage LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2020-12-14

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first