Substation Scout

Royal River BESS

ERCOT queue ID 24INR0282

Royal River BESS (24INR0282) is listed in the ERCOT interconnection queue as a 310.7 MW battery project in Brazoria County, TX. The filing names Tap Angleton - West Columbia as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of July 28, 2028. It records the screening study as complete on June 27, 2022, the full interconnection study as approved on October 9, 2025 and the interconnection agreement as signed on December 15, 2023.

Queue ID24INR0282
Project nameRoyal River BESS
Status (as published)SS Completed, FIS Completed, IA
SubstationTap Angleton - West Columbia
Point of interconnectionTap 138kV 42110 Angleton - 43381 West Columbia
CountyBrazoria
StateTX
Voltage138 kV
Capacity310.7 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-07-28
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityRoyal River LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2023-12-15
Screening study complete2022-06-27
Full interconnection study approved2025-10-09
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first