Royal River BESS
ERCOT queue ID 24INR0282
Royal River BESS (24INR0282) is listed in the ERCOT interconnection queue as a 310.7 MW battery project in Brazoria County, TX. The filing names Tap Angleton - West Columbia as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of July 28, 2028. It records the screening study as complete on June 27, 2022, the full interconnection study as approved on October 9, 2025 and the interconnection agreement as signed on December 15, 2023.
| Queue ID | 24INR0282 |
|---|---|
| Project name | Royal River BESS |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Tap Angleton - West Columbia |
| Point of interconnection | Tap 138kV 42110 Angleton - 43381 West Columbia |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 310.7 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-07-28 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Royal River LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2023-12-15 |
| Screening study complete | 2022-06-27 |
| Full interconnection study approved | 2025-10-09 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.