Miranda Solar Project
ERCOT queue ID 24INR0161
| Queue ID | 24INR0161 |
|---|---|
| Project name | Miranda Solar Project |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Tap Fowlerton - San Miguel Ckt 1 |
| Point of interconnection | Tap 345kV 5709 Fowlerton - 5901 San Miguel Ckt 1 |
| County | McMullen |
| State | TX |
| Voltage | 345 kV |
| Capacity | 261.4 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2027-12-06 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Miranda Solar Project, LLC |
|---|---|
| Cdr Zone | SOUTH |
| Fuel Code | SOL |
| Technology Code | PV |
| Ia Signed | 45489 |
| Screening Study Complete | 44568 |
| Fis Approved | 45538 |
| Air Permit | Not Required |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.