Substation Scout

McMullen, TX interconnection queue

1 active project totalling 261.4 MW in the ERCOT queue.

1active projects
261.4active MW
1total filed
Queue IDProjectkVMWResourceStatus
24INR0161 Miranda Solar Project 345 261.4 Solar SS Completed, FIS Completed, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.