BRP Hemera BESS
ERCOT queue ID 24INR0134
BRP Hemera BESS (24INR0134) is listed in the ERCOT interconnection queue as a 207 MW battery project in Deaf Smith County, TX. The filing names Deaf Smith Substation (#, Oncor) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 1, 2029. It records the screening study as complete on March 25, 2022.
| Queue ID | 24INR0134 |
|---|---|
| Project name | BRP Hemera BESS |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Deaf Smith Substation (#, Oncor) |
| Point of interconnection | 345 kV Deaf Smith Substation (#23908, Oncor) |
| County | Deaf Smith |
| State | TX |
| Voltage | 345 kV |
| Capacity | 207 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-12-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Deaf Smith, TX: 11 requests in the ERCOT queue, 11 active totaling 6,391.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | BRP Hemera BESS LLC |
|---|---|
| CDR reporting zone | PANHANDLE |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2022-03-25 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.